Model No. GS83-C VGS83-B 697.68600Owner's Manual & Assembly Instructions RE012,4 m x 0,9 m 246,1 cm x 96,4 cm 252,4 cm
Parts List QR1010Assembly Part Part Quantity CheckKey No. Number Description in Carton List 1 10202 Side Floor Frame 2
11Assembly by Key No. QR11
1266150Screw Driver Holder (1)66149Tool Hook (5)66609Hinge (4)66054Latch - Attic Door (1)66183Roof Trim Cap(2 right & 2 left)67236Adhesive Pad (2)
Step 1BE13● Parts Needed For ●Floor Frame Assemblies●●●●● 9866 Outer Front Floor Frame (2)●●●●● 10201 Center Front Floor Frame (1)●●●●● 9868 Rear
Step 2BE14● Parts Needed For ●Floor Frame●●●●● Front Floor Assembly (1)●●●●● 10202 Side Floor Frame (2)●●●●● Rear Floor Assembly (1)14The floor frame
15Step 3BE15● Parts Needed For ●Floor Frame Kit1 Snap channels 10200 together as shown. Join thechannels by inserting four nuts and bolts. Make twoc
Step 4BE16161 Do not attach decking material at this time!NOTE: FLOOR FRAME MUST BE LEVEL ANDSQUARE BEFORE PROCEEDING!2 Check floor frame for sl
Finishing Material BE17Step 6 Placement & Amount of MaterialStep 517CORRECTINCORRECTDrill and fasten woodto steel frames usingdry wall scre
● Parts Needed For ●Header/Door HeaderAssemblyStep 7QR1818STEP13STEP99452STEP101849947END VIEWThe header assembly is made up oftwo pieces. The door he
● Parts Needed For ●Roof Beam/RearWall Angle AssemblyStep 8BE1919STEP198852STEP●●●●● 9885 Roof Beam (2)●●●●● 9883 Rear Wall Angle (2)Rear Wall Angle A
Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand
● Parts Needed For ●Right Door AssemblyStep 9QR2020STEP1101836STEPThe steps on this page tell how toassemble the right door. Proceed asfollows:1 Posit
● Parts Needed For ●Left Door AssemblyStep 10QR2121STEP12STEP99419905END VIEW99419944677343STEP●●●●● 9905 Door Brace (2)●●●●● 9941 Left Door (1)●●●●●
22● Parts Needed For ●Corners/GablesStep 11BE222STEP9872TOP VIEWWide SideSIDE98919870Panels rest onframe as shown98744Attach panels with extraholes fa
● Parts Needed For ●FramesStep 12BE23232STEPHeader/Door Header AssemblyRear Wall Angle Assembly3STEP1STEP●●●●● Rear Wall Angle Assembly (1)● ● ● ● ● H
● Parts Needed For ●Wall PanelsStep 13BE2424STEPBe sure that you have the correctpanel in each position. Do this byoverlapping the panels and determi
● Parts Needed For ●Door JambsStep 14BE2525STEP1STEP29892TOP VIEW●●●●● 9892 Right Door Jamb (1)●●●●● 9893 Left Door Jamb (1)The door jambs reinforce t
● Parts Needed For ●Roof BeamStep 15BE26261●●●●● Roof Beam Assembly (1)1Bend tab at each end of roof beamassembly upward. Position beamacross width
● Parts Needed For ●Right/Left Roof PanelsStep 16BE27272●●●●● 9878 Right Roof Panel (1)●●●●● 9879 Left Roof Panel (1)9879 Left Roof PanelSTEPInstallin
● Parts Needed For ●Roof PanelsStep 17BE2828●●●●● 9880 Roof Panel (2)●●●●● 9881 Roof Panel (1)1 Install a wide roof panel 9880,narrow roof panel 9881
● Parts Needed For ●Roof TrimStep 18BE2929●●●●● 9898 Right Roof Trim (2)●●●●● 9899 Left Roof Trim (2)1STEP9898 Right Roof Trim1 Overlap the right &
Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with goo
● Parts Needed For ●Shelving/Channel/Tool BarStep 19BE30301STEPTool Hook (5)4STEP2STEP98841 Overlap the rear wall channelpieces as shown in the figur
● Parts Needed For ●Installing DoorStep 20QR31311STEP●●●●● Right Door Assembly (1)●●●●● Left Door Assembly (1)2STEPSet Screw1 Position doors in corner
SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurswhen bare metal is exposed to moisture. Problemareas include screw holes, unfin
Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your buildi
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia
ACCESSORIES... A6 WEB* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20,3-30,5 cm
THIS PAGEWA SLEFTBLANKINTENTIONALLY7
THIS PAGEWA SLEFTBLANKINTENTIONALLY8
It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil
Kommentare zu diesen Handbüchern