* Size rounded off to the nearest footBUILDING DIMENSIONSCAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AV
It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil
11Remove from bag of screwsand save for the last step67545Weather Stripping (1)66382Lower Door Guide (4)66242Door Slide (4)66183Roof Trim Cap(2 right
Parts List G1212Assembly Part Part Quantity CheckKey No. Number Description in Carton List 1 3719 Door Handle Brace 2 2 5290 Fron
13Assembly by Key No. G133113111812111714262727 2419 1024101519341516313541232323324038192977323211372199778394140242424242424426121610111745511371
The front floor frame is made up ofthree pieces. The side floor framesand the rear floor frame are made upof two pieces. The holes in thesepieces will
Step 2G1515● Parts Needed For ●Frame AssembliesThe main frame pieces reinforce thewalls. These pieces will later be in-stalled at the top edge of the
16The roof beams join the two gablesand support the roof panels. The mainroof beam is made up of four piecesoverlapped back to back at the cen-ter. Th
17NOTE:Door Track Splice (painted part)Step 4A17● Parts Needed For ●Door Track Assembly●●●●● 6403 Door Track Splice (1)●●●●● 9366 Door Track (2)The do
●●●●● Front Floor Assembly (1)●●●●● Side Floor Assembly (2)●●●●● Rear Floor Assembly (1)● Parts Needed For ●Floor FrameStep 5G18The floor frame must b
1 Position right and left cornerposts at the corner of the floor frameas shown. The angled end of eachpost must be placed on top of all 4corners.
2Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand
The door jambs reinforce the dooropening and provide an attractivetrim. The splice post supports thewall.1 Position splice post at the centerof the r
The studs provide a surface for at-taching the siding panels.1 Following dimensions, measuringfrom the ends of angles, place a studbetween each corner
Each screw in the wall requires awasher.1 Slide side siding (5 board) intochannels of corner and splice posts,flat edge upward, bottom edge downrestin
1 Slide rear siding (5 board) intochannel of corner and splice postsfastening to rear frame as shown inprevious step 9.2 Install rear siding (3 board)
24The gables go on top of the front andrear walls to support the roof beams.NOTEThe gables are packed nestedtogether and might be mistakenas one piece
1 Lift and fasten a right and leftgable, under angle at corner, to therear wall angel with screws.Hint: On the rear gable, use a boltand nut at the
● Parts Needed For ●Roof Beam/BracesStep 13G26●●●●● Main Roof Beam (1)●●●●● Single Roof Beam (2)●●●●● 9204 Roof Beam Brace (2)261 Apply the weather st
27Step 14G27● Parts Needed For ●Right Roof Panel●●●●● 8578 Right Roof Panel (1)Installing the roof panels is best donewith a step ladder. Begin insta
1 Install a left roof panel at the leftrear and right front corner of the roof.Install a right roof panel at the leftfront corner of the roof.3 Instal
1 Install the second ridge cap over-lapping the first ridge cap while in-stalling the remaining roof panels.Continue weather stripping the ridge.2 Fas
3Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with go
30●●●●● 3719 Door Handle Brace (2)●●●●● 9200 Right Door (1)●●●●● 9201 Left Door (1)●●●●● 6264 Horizontal Door Brace (4)●●●●● 9202 Vertical Door Brace
31Step 18A31● Parts Needed For ●Door Installation & Adjustment●●●●● Right Door Assembly (1)●●●●● Left Door Assembly (1)1 From inside the building,
SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurswhen bare metal is exposed to moisture. Problemareas include screw holes, unfin
4Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your build
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia
ACCESSORIES... A6 WEB6* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20-30cm)
THIS PAGEWA SLEFTBLANKINTENTIONALLY7
THIS PAGEWA SLEFTBLANKINTENTIONALLY8
The Foundation For Your Building9FRONT(DOOR)FRONT(DOOR)Foundation A09Note: Finished Slab dimensions, with lumber removed.OPTION 1: ARROW FLOOR FRA
Kommentare zu diesen Handbüchern